voidly
7-day shutdown forecast · calibrated

Colombia14% peak risk

Calibrated via isotonic refit on 810 live outcomes (2026-05-20). See calibration drift → · Colombia country profile →

The Voidly Sentinel model forecasts a peak shutdown probability of 13.7% for Colombia over the next 7 days, with the highest risk on day 7 (Thu, May 28). Average risk across the window: 9%.

90% conformal interval: [0%, 49%]empirical coverage 90.4% (target 90%).

Per-day risk

0%25%50%75%100%6%Thu4%Fri8%Sat6%Sun10%Mon9%Tue12%Wed14%Thu

Dashed line: 50% threshold. Bars colored by risk band.

Per-day drivers

DateRiskDrivers
Thu, May 216% · LowColombian Presidency in 10d
Fri, May 224% · LowColombian Presidency in 9d
Sat, May 238% · LowColombian Presidency in 8d
Sun, May 246% · LowColombian Presidency in 7d
Mon, May 2510% · LowColombian Presidency in 6d
Tue, May 269% · LowColombian Presidency in 5d
Wed, May 2712% · LowColombian Presidency in 4d
Thu, May 2814% · LowColombian Presidency in 3d

What drove the prediction

Top features by signed contribution to today's risk score. Positive (↑) features push the prediction higher; negative (↓) features push it lower.

  • gdelt_unrest_30d-0.029
  • recent_shutdown+0.024
  • risk_tier-0.014

Similar past event

The model found a similar event in the corpus. Reading the incident report tells you what “14% risk for Colombia” looked like when it actually happened.

CO-2026-0035critical

disruption in CO · Wed, May 13

Recent evidence

Live measurements from upstream networks supporting this forecast. Click any link to view the raw data on the source.

Honest caveats

  • The model's base AUC on a time-based holdout is 0.50 (random on novel events). LOCO median AUC is 0.91. The calibrated number you see above is the most-honest operational figure but it's NOT a guarantee.
  • Calibration was refit on 2026-05-20 on 810 live outcomes — it's good for the 30 watched censoring countries but will drift if the world changes. Nightly recalibration runs at 04:30 UTC.
  • A 70% forecast doesn't mean a shutdown is guaranteed; a 20% forecast doesn't mean it's safe. The 90% conformal interval is the honest uncertainty band.
  • For long-form methodology see /methodology and the calibration refit finding.

Model version: v1@2026-05-21T04:20:38.966951

Related